+Push-to-Connect Straight Fitting | FerruleXSkip to content
Push-to-Connect Straight Fitting — FerruleX stainless steel fittings

Push-to-Connect Straight Fitting

Push-to-Connect Straight Fitting: stainless push-in tube fitting for air/water. SS304/316. FerruleX RFQ. Stocked sizes ship fast. Export RFQ only — no cart.

Brand
FerruleX
Material
SS304 / SS316
Type
Push-to-connect straight
Media
Air / water (confirm)
Order mode
Factory RFQ

Request a factory quote

  • Stock5–7 days after confirmation
  • Make to order15–25 days production
  • Payment / termsT/T ~30% or L/C · FOB Shanghai / Ningbo
  • OEMLogo and drawings accepted · price on RFQ

Description

Push-to-connect straight fittings join air or water tube with a click-in stainless body — no flare tools. FerruleX SS304/SS316 fittings typically sit in the 4–6 mm OD class; confirm exact OD on the RFQ. Pneumatic OEM and maintenance-friendly utility lines use them for rapid tube changes. Release the collar to remove tube; do not pry with screwdrivers that scar the OD. FerruleX factory RFQs cover stocked straight push-in fittings with fast shipping. Keep tube ovality in check after unreeling or the grab ring will not seat evenly.

Push-in stainless is still for compatible tube OD and hardness; forcing oversized tube ruins the grab ring. Keep tube ovality in check after unreeling. FerruleX can supply matching elbows and bulkheads in the same series on one quote. Push tube to click; release collar to remove. Straight body. SS304 / SS316.

Install
Push tube to click; release collar to remove.
Pattern
Straight body.
Materials
SS304 / SS316.

Specifications

SpecificationValue
BrandFerruleX
MaterialSS304 / SS316
TypePush-to-connect straight
MediaAir / water (confirm)
Order modeFactory RFQ

Request Quote

Prices stay on the RFQ. Send size, material, quantity and destination — the factory replies with price, lead time and packing.

Request a factory quote

Shipping & packing

Parts ship in a bag, inner carton and export carton. Large lots can go in a wooden case with a packing list and invoice. Default term is FOB Shanghai or Ningbo. Full notes are on thedelivery page.

Questions buyers ask

What should I send for a quote?

Size, material (SS304, SS316 or SS316L), quantity, end connection and destination. Add a sketch if the two ends are different.

How fast can this ship?

Stocked sizes usually leave 5–7 days after you confirm the quote. Make-to-order runs are about 15–25 days in production, then transit. Name the port if you want CIF.

Can I order a small trial or put my logo on it?

Yes. Trial quantities are quoted, and OEM marking or drawings are accepted. Payment is normally T/T with about 30% deposit, balance before shipment, or L/C at sight.

Related products