Factory & Export
How the FerruleX factory quotes RFQs, stocks common stainless fitting and valve sizes, packs export cartons and ships stocked sizes in 5–7 days.

EN 10204 3.1 Certificates for Stainless Fittings
EN 10204 3.1 explained for stainless fittings buyers: the 2.1/2.2/3.1/3.2 type table, MTR equivalence, heat-number traceability and what to write on the RFQ.
Read article →
FOB vs CIF vs EXW: Shipping Terms for Importing Fittings from China
FOB vs CIF vs EXW for importing fittings: who arranges and pays what, where risk really transfers under Incoterms 2020, and which term fits which buyer.
Read article →
How to Write an RFQ for Stainless Fittings That Gets a Fast Factory Quote
How to write a stainless fittings RFQ that gets a fast factory quote: the line-item checklist, what each missing field costs, and a worked example.
Read article →
HS Codes for Stainless Steel Fittings and Valves
HS code stainless steel fittings and valves: the verified heading 7307 and 8481 reference for importers, and why the right code speeds customs clearance.
Read article →
How Our Stainless Fittings Factory Ships Faster
How FerruleX factory stocking, RFQ clarity and packing help overseas buyers get stainless steel fittings with shorter lead times.
Read article →